Spruce Lodge Tiles in the dinning room were installed over paneling plywood and the plywood was lifting. We had to cut out the damaged plywood and replaced it and replaced the damaged tiles.
Pipe froze and broke in two different places. The pipe was cut and replaced with pex piping and shark bite vale and fittings.
In the process of removing the gas stoves in motel five and six while remodeling them we were able to find a gas leak in one of the lines. One of the fittings were cracked and gas was leaking. The fitting was replaced and extra lines running to the stoves that were removed were eliminated.