With cold weather approaching, we need to check, do maintenance, and start-up all the heating systems at Camp:
NOTE: It would be good to collect all model numbers when doing this work so we can build a current equipment list in KB of all fixed heating appliances.
Heat Settings After Fire-up: Staff Housing should be set to 68-72F, based on resident preference. Guest areas are 55F before the weekend and 70 on the weekend (only if occupancy).
Boilers
* Check starting fuel levels
* LP: Blow out fire burner boxes
* Oil: Check/empty filter/water catch
* Fire-up: Check water level and pressure
* Test all zone valves and circulators
Oil Boilers: Admin House, House 1 & 2
LP Boilers: House 3, House 5, Twin Birch Motels 2-4
Forced Air
* Check starting fuel levels
* Change intake air filters
* Fire-up
Oil Forced Air: Faith Chapel
LP Forced Air: Promise Center, Cabin 1, 2, 4, 5, 6, 7, 8
LP Air Direct Air/Registers: Twin Birch Motels 5-7, Water Systems Building