Repaint Outdoor Handrail at Cabin 4 Home › Threads › Buildings › Repaint Outdoor Handrail at Cabin 4 Tagged: buildings, Cabin 4, maintenance, Promise Woods, TODO This topic has 0 replies, 1 voice, and was last updated 4 months ago by Ben Cheek. Viewing 0 reply threads Author Posts August 22, 2024 at 11:30 am #2794 Ben CheekKeymaster The black metal pipe handrail on the steps and walk approaching Cabin 4 has scratches and wear exposing the underlying pipe. Some rest is evident. Rust should be removed down to fresh metal and entire rail re-painted several coats. Author Posts Viewing 0 reply threads You must be logged in to reply to this topic. Log In Username: Password: Keep me signed in Log In